Gippsland › Latest news › Latrobe Local News
Trees take centre stage at Gippsland Performing Arts Centre
Man-made trees as grand feature of the facility, welcoming the visitors.
Man-made trees are creating a show of their own at the new Gippsland Performing Arts Centre (GPAC). The last of 10 timber columns in the shape of trees were lifted into position at the arts centre in Traralgon recently.Man-made trees to be installed at they facility foyer to welcome the visitors
The timber columns will be a grand feature of the facility’s foyer and highlight advanced engineering techniques within Gippsland’s timber industry. The foyer will contain the box office for the state-of-the-art theatre, a new café and Traralgon’s Visitor Information Centre.
The trunks will reach 8.5m high and are made using timber milled locally in Heyfield by Australian Sustainable Hardwoods. They were assembled by TGA Engineers in Bayswater by glue-laminating timber lengths together to produce superior strength.
Gippsland’s timber and engineering
Each column takes approximately 16 hours to make before they are sanded, polished and have custom fabricated steel connections attached. The members are then bolted together and capped with timber plugs to conceal the fixings. The trunks are made from Victorian Ash, which has some of the best strength-to-weight ratios of any timber internationally, saving manufacturing time and using 40 per cent less timber than making the same product using European timbers. "These tree columns are a celebration of Gippsland’s timber and engineering industries, and being so beautiful, will create a dramatic impression when theatre-goers enter the Gippsland Performing Arts Centre," Latrobe City Council Mayor, Cr Sharon Gibson said.Acknowledgement of local businesses
Federal Member for Gippsland Darren Chester said the installation of the feature trees at the Gippsland Performing Arts Centre was a fantastic milestone for the project. "This is a wonderful acknowledgement and achievement for local business Australian Sustainable Hardwoods (ASH) in Heyfield, that manufactured the Victorian Ash timber products used to create the trees. It is incredibly important that large scale infrastructure projects in our region support and invest in our local businesses."
Project amenities and features
The arts centre will include a state-of-the-art theatre, with a 25m high fly tower, 750 seats across two levels, conference/meeting rooms, a café and outdoor event spaces. The fly tower is used for flying in stage backdrops, lighting rigs, curtains and other equipment needed for small to large productions. The Latrobe Creative Precinct is due to be completed in the second half of 2021.
The project has been made possible by collaborative investment from the Australian Government’s Community Development Grants Programme ($10 million), the Victorian Government’s Regional Jobs and Infrastructure Fund ($10 million) and Latrobe City Council.
Pictures from Cr Dan Clancey - Latrobe City Council Facebook page.
Source: www.gippsland.com
Published by: news@gippsland.com
Latest News
Baw Baw Shire residents urged to participate in 2026 Community Satisfaction Survey phone interviews
Community feedback strengthens Wellington's Road Management Plan, highlighting priorities for road upgrades

East Gippsland kids invited to join and send entries for National Water Week poster competition by 12 September 2025

Future Wellington Community feedback shapes draft plans, final input invited before 16 July 2025

Gippsland Water commits to keeping customer bills affordable despite cost of living pressures

Have your say on Latrobe's draft Domestic Animal Management Plan 2026 - 2029 until 29 July 2025

Latrobe City Council endorses new Council Plan and Community Vision 2025-2029 to guide Latrobe's future growth

Wellington Shire Councillors advocate for region's needs at National Local Government Assembly in Canberra on 24 - 27 June 2025

East Gippsland tourism and hospitality masterclass to build sustainable, resilient businesses and grow positive

Southern Rural Water celebrates 30 years of service with modernisation, partnerships and sustainable water
