Gippsland › Latest news › East Gippsland Local News
Sinkhole repairs underway at Woodglen water storage basin by McInnes Earthmoving
Repair works are ongoing at East Gippsland Water's Woodglen Water Treatment facility to address sinkholes in the storage basin. The project aims to enhance safety and maintain water quality for customers.
Works are underway to repair a number of sinkholes that have appeared at a water storage basin at East Gippsland Water's Woodglen Water Treatment facility. Sinkholes in water storage basins can be caused by the displacement of materials (sand, clay gravel, etc) beneath the surface of the embankment. This is usually caused by rain and runoff penetrating the surface layers, the displaced materials then cause the surface to collapse and create a sinkhole.
McInnes Earthmoving undertaking works on the sinkhole repairs at East Gippsland Water's Woodglen Water Treatment facility
Woodglen basin repairs
East Gippsland Water Executive Manager Sustainability and Infrastructure, Neville Pearce, said: "Around 100 sinkholes have been detected at the Woodglen No.2 water storage basin and repairs are necessary because if left untreated they have the potential to cause safety concerns in the future."
"The project is costing around $500k and the works involve digging down approximately 1 to 1.5 metres to expose the existing sand chimney filter. This will then be raised to the full height of the basin, new sand material placed in the filter trench and mechanically compacted to a density that will protect the embankment to improve the safety of the basin."
"These works are a great example of East Gippsland Water maintaining our assets to ensure high-quality drinking water is provided to our customers." Mr Pearce said. McInnes Earthmoving from Heyfield recently commenced the works which should be complete by the end of April 2024.
Pictures from East Gippsland Water website.
Source: http://gippsland.com/
Published by: news@gippsland.com

Gippsland Water offers face-to-face bill help at pop-up sessions across Latrobe, Baw Baw and Wellington

Martin Cameron slams Allan government's ongoing neglect of Hazelwood North CFA volunteers and urgent station upgrades

Southern Rural Water announces safer bridge boosting Clydebank access and safety with modern standards by November

'Amp It Up' youth conference empowers East Gippsland students with inspiration and resilience on 23 July 2025

Baw Baw Shire Council seeks community feedback on five key strategic plans to guide council's next four years by 3 August 2025

Darren Chester warns Labor's new car tax will hit Gippsland families, hikes cost of utes, SUVs, four-wheel-drives, vehicles

Darren Chester, RSL unite to support Gippsland Veterans, challenge negative myths, highlight service strengths and opportunities

Forge Theatre ignites East Gippsland with comedy, music, storytelling and bold performances this winter season

Gippsland Water summer internship is now open, offering students practical experience from November 2025 to February 2026
