Latest News
• Add My News • Search Old News

Upgraded Old Melbourne road reopened to trafficSealing of stage-two of the Old Melbourne Road upgrade has been completed and the road has been reopened to traffic. By Latrobe Shire Council - 21st October 2004 - Back to News Old Melbourne Road serves as an important alternative collector road between Morwell and Traralgon, and a significant feature of the road upgrade has been the elimination of the S-bends around the Waterhole Creek area.
Latrobe City Mayor, Councillor Darrell White, said the upgrade and realignment of Old Melbourne Road had improved road safety by removing the existing sharp curves, rises and depressions, and providing wider traffic lanes and sealed shoulders, resulting in a safer environment for motorists and cyclists.
Latrobe City’s Maintenance Engineer, Jey Vyravipillai, said that major culverts had been installed across Waterhole, Plough and Tandarra Creeks on the new alignment of the road; and road pavement and sealing work had been completed.
"The road pavement on the old alignment has also been removed and topsoiled, and the surface is being prepared for planting in Autumn," Mr Vyravipillai explained.
"The environment has been given top priority on this project, as the sensitive nature of the grassy woodland vegetation was well recognised.
"Willow and feral pines were removed from areas abutting the realignment to upgrade the creek environment, and riparian vegetation including additional paperbarks and sedges are being planted as part of the erosion control works.
"Water quality in Waterhole Creek will actually be improved as a result of the works to date and the creek bank restoration," Mr Vyravipillai said.
"Many tonnes of illegally dumped household rubbish including refrigerators and washing machines were also removed," he added.
Latrobe City’s Chief Executive Officer, Paul Buckley, said that importantly, the new road alignment had been chosen to minimise any impacts on the remnant grasslands which were considered more valuable than any trees needing to be removed.
"It is pleasing to note how well the environmental and engineering aspects of this project have been handled. I am sure motorists who use Old Melbourne Road on a regular basis will be delighted with the result, and feel that any inconvenience they’ve encountered while the work was undertaken was worthwhile," Mr Buckley said.
"Even more pleasing is the fact that stage-two of the Old Melbourne Road upgrade has been reopened to motorists ahead of schedule," Mr Buckley added.
Source: www.gippsland.com Published by: news@gippsland.com

Related Articles- Copelands Road $4.9M upgrade complete, enhancing traffic flow, safety, pedestrian access, and bicycle facilities
The $4.9 million Copelands Road upgrade is complete, featuring improved traffic flow, safety, Moe River bridge, drainage works, footpaths, and a shared bicycle path, delivered on time and within budget. - Omeo’s Day Avenue upgraded with safer streets, accessible paths, bike parking, greenery, and Victorian government investment
Omeo’s Day Avenue upgraded with safer streets, accessible paths, signage, parking, bike facilities, greenery, and $200,000 Victorian government investment, creating jobs and enhancing experiences for locals and visitors. - Letters to 1,600 Drouin households support advocacy for urgent intersection upgrades across Baw Baw Shire’s growing road network
Baw Baw Shire is delivering letters to 1,600 Drouin households urging community support for State funding of critical intersection upgrades amid growing congestion, safety concerns, and regional population growth pressures. - Walhalla Church Hill Road landslip repaired, fully reopened following 2022 storm recovery works completion
Repairs to the Church Hill Road landslip in Walhalla are complete, reopening the road with DRFA-funded realignment, drainage, safety barriers, and asphalt surfacing, ensuring safe travel for residents and tourists. - East Gippsland Rail Trail upgraded and officially opened, boosting tourism, and local economy across the 96km trail
The final 11.46 km of the East Gippsland Rail Trail is complete, fully resurfaced, and open, boosting tourism, supporting local businesses, and providing a high-quality recreational asset for the community. - Stewart Road Bridge reconstruction in Kernot approved, $1.768M federal funding restores vital community infrastructure
Bass Coast Council’s Stewart Road Bridge reconstruction in Kernot approved, receiving $1.768 million federal funding, restoring safe access, supporting local residents, industry, emergency services, with tendering expected early 2026. - Stewart Road Bridge reconstruction in Kernot progresses with $2.35M tender awarded, restoring safe local access
Bass Coast Shire Council has awarded a $2.35 million tender to rebuild Stewart Road Bridge, restoring safe access, supporting emergency services, and increasing load capacity to 44 tonnes. - Paynesville slip road Maritime Precinct enters final construction phase with jetties, boat ramp and seawall nearing completion
Construction of Paynesville Slip Road Maritime Precinct is nearing completion, delivering new jetties, boat ramp, seawall, and waterfront spaces to support boating, tourism, and the local marine industry. - Newhaven residents invited to shape safer roads, transport and future traffic planning through community feedback until 27 May 2026
Bass Coast Shire Council is seeking Newhaven community feedback on transport and road safety to inform a Local Area Traffic Management Plan improving movement, safety, infrastructure planning and future funding priorities. - Have your say on the draft Roadside and Footpath Trading Policy balance road access, submit by 28 September 2025
Baw Baw Shire Council invites feedback on its Draft Roadside and Footpath Trading Policy, aiming to balance vibrant business activity with safe pedestrian access. Consultation runs 29 August - 28 September on Baw Baw Connect. - Danny O’Brien criticises Labor’s road funding, citing Gippsland highways’ ongoing underinvestment and worsening pothole backlog
Danny O’Brien says Labor’s $1.04 billion roads blitz exposes a large pothole backlog, highlighting years of underinvestment and ongoing deterioration of Gippsland’s regional road network. - Darren Chester completes 19th Melbourne Marathon, joining 14,500 runners in iconic Gippsland sporting tradition
Darren Chester completed his 19th Melbourne Marathon, joining 14,500 runners. The sold-out event celebrated fitness and community spirit, with Chester inspired by marathon legend John "Dobbo" Dobson's 47th consecutive run. - Latrobe City Council to negotiate Old Methodist Church sale following community consultation and support heritage reuse
Following community consultation, Latrobe City Council will negotiate the Old Methodist Church sale to Traralgon Historical Society, supporting heritage reuse and allocating $86,000 funding contingent on securing a VicTrack lease. - Baw Baw Shire Council adopts 2025 - 2029 Road Management Plan, updating registers for safe, sustainable, community-focused roads and footpaths
Baw Baw Shire Council has endorsed the 2025-2029 Road Management Plan, updating public road and footpath registers, removing recreational Walhalla Road sections, and ensuring safe, sustainable local road management. - East Gippsland expands Whelans Group road maintenance contract, ensuring service continuity and local job retention across shire
East Gippsland Council has expanded Whelans Group’s road maintenance role, taking over areas previously managed by Cranes Asphalting, ensuring service continuity, high standards, and retention of local jobs across the shire. - Baw Baw Draft Budget invests millions in roads, sporting projects and infrastructure while seeking community feedback until 14 May 2026
Baw Baw $127.5 million Draft Budget includes $50.9 million for infrastructure, major sporting upgrades, road projects and long-term planning, with community feedback open until 14 May. - Latrobe City urges the Victorian Minister for Roads and Road Safety urgent activation of Traralgon Bank Street and Princes Highway traffic lights
Latrobe City Council urges Victorian Ministers to urgently activate the Bank Street–Princes Highway traffic lights in Traralgon, addressing safety concerns after completed works remain non-operational since 2018. - Darren Chester braces Gippslanders demand for safer roads as funding stalls while initiatives like Cycling Without Age grow
Gippslanders demand urgent road repairs, with Princes Highway neglected for years, while initiatives like Cycling Without Age provide older residents joy, connection, and community engagement across the region. - Cape Paterson Traffic Plan adopted to improve safety through community-driven road and pedestrian upgrades
Bass Coast Shire Council has adopted the Cape Paterson Traffic Management Plan, developed with strong community input to improve safety through speed reductions, traffic calming, better intersections, and pedestrian-cyclist connectivity. - Mallacoota streetscape upgrade complete, enhancing safety, drainage and landscape ahead of busy Christmas holiday season
Mallacoota’s upgraded streetscape, funded with $1.5 million, improves pedestrian safety, drainage, and landscaping, preparing the coastal town for a busy Christmas holiday season, says local MP Darren Chester. - Dock Cafe upgrade at Port of Sale ensures minimal disruption while enhancing community space ahead of reopening in 5 June 2026
Wellington Shire Council is pleased to share news of a short upgrade planned for the Dock Cafe, located at the Port of Sale. The works will help ensure the cafe continues to be a welcoming place for locals and visitors to enjoy. - Melina Bath condemns Labor government for recycled road funding spin and failure to deliver real investment
Melina Bath has accused the Allan government of recycling old road funding announcements, labelling them propaganda and demanding genuine investment to address the worsening condition of regional Victoria's neglected roads. - Expressions of interest open for new Slip Road Maritime Precinct marina berths in Paynesville boosting boating access
East Gippsland Shire Council is calling for expressions of interest for new Paynesville marina berths, expanding capacity and supporting growing boating demand across the Gippsland Lakes. - Martin Cameron criticises Labor for reducing Hazelwood Road speed limit instead of repairing dangerous regional road conditions
Nationals MP Martin Cameron criticises Labor for reducing Hazelwood Road’s speed limit instead of repairing its deteriorating surface, calling for urgent action to improve regional road safety. - Dinni Birraark Walk upgrades in Newlands Arm to improve safety, accessibility and environmental protection along foreshore trail works
East Gippsland Shire Council will upgrade a 372-metre section of the Dinni Birraark Walk, improving safety, accessibility and shoreline stability, with works beginning 15 June alongside Paynesville Landcare Group. - Baw Baw Shire Council secures funding for four key road safety projects through TAC and federal Blackspot Programs
Baw Baw Shire Council secured TAC and Federal Blackspot funding for four key road safety projects in Warragul and Drouin, targeting high-risk areas with upgrades to improve safety for all road users. - Baw Baw Council endorses key 2026 advocacy priorities, including Weebar Road roundabout, Rokeby-Noojee Trail, sports infrastructure and regional investment
Baw Baw Shire Council has endorsed its 2026 advocacy priorities, including Weebar Road roundabout, Rokeby-Noojee Trail, Trafalgar oval, intersection upgrades, sporting infrastructure, business attraction, and peri‑urban recognition. - Princes Highway $2M upgrade improves safety and access for pedestrians at Lakes Entrance and Kalimna
Nearly $2 million in joint government funding will upgrade Princes Highway at Lakes Entrance and Kalimna, improving pedestrian safety, access, and traffic flow with new medians, lighting, safety platforms, and path reconstruction. - Allan Labor government misled East Gippsland over Paynesville Road inspections, leaving "rollercoaster" section untested, says Tim Bull
The Allan Labor government misled East Gippsland by failing to inspect the problematic Paynesville Road section, delaying repairs and leaving the "rollercoaster" stretch untested for nearly three years, says Tim Bull. - Darren Chester welcomes $6.2M Traralgon Recreation Reserve redevelopment with upgraded facilities for Latrobe Valley sports clubs
Darren Chester welcomed the $6.2 million Traralgon Recreation Reserve redevelopment, providing modern changerooms and upgraded facilities through joint funding to support Latrobe Valley sports and long-term community participation. - Rokeby to Noojee $4M trail upgrade officially opens, enhancing accessibility, safety, and visitor experience across region
A $4 million upgrade of the Rokeby to Noojee Trail has officially opened, delivering improved surfaces, facilities, signage and lookouts, with $3 million Victorian government funding and strong community contributions celebrated. - Wellington libraries upgrade with RFID technology, enabling faster borrowing and improved user experiences across all branches over six months
Wellington libraries are upgrading with RFID technology, introducing self-loan stations, automated return chutes, and smart bins, improving borrowing efficiency, reducing manual handling, and allowing staff to focus on programs and services. - Gippsland Water invests $550,000 to upgrade Peterkin Street sewer pump station, ensuring reliable wastewater services for Traralgon
Gippsland Water is investing $550,000 to upgrade Traralgon largest sewer pump station, replacing ageing pipes to ensure reliable wastewater services for 5,200 households. Works are underway and due for completion in September. - Union Theatre Wonthaggi HVAC upgrade begins, ensuring comfort, reliability, and long-term operation for the community
Bass Coast Shire Council is upgrading Wonthaggi’s Union Theatre HVAC system, ensuring comfort, reliability, and future-proofing the historic venue, with works valued at $899,000 and expected completion by 20 March 2026. - South Gippsland Shire Council organisational performance report, road safety, education and more updates on council projects
South Gippsland Shire Council’s Autumn 2026 report highlights strong progress on 2025–29 priorities, sound finances and all annual actions on track. Updates include FOGO rollout, road safety, community events, grants, and engagement opportunities. - Bass Coast wins National AustStab Award for sustainable road recycling and innovative rehabilitation
Bass Coast Shire Council won the 2025 AustStab Award for Excellence for pioneering road recycling methods, cutting emissions by 85%, truck movements by 80%, and delivering faster, more sustainable, durable roads with less disruption. - Drouin Picnic Racing Club receives $13,519 upgrade boost through Allan Labor government's Regional Customer Facilities Program
Drouin Picnic Racing Club will receive $13,519 to upgrade facilities and enhance race day experiences, part of the Allan Labor government's $730,000 investment improving regional racing venues statewide. - Gippsland Water completes major Warragul sewer upgrade, boosting capacity and supporting town’s rapid growth and future reliability
Gippsland Water has completed a 1.5-kilometre Warragul sewer upgrade, increasing capacity, improving reliability, supporting population growth, and protecting the environment, including relocation of threatened local species during construction. - Drouin’s Commercial Place precinct to get $1.1M upgrades, enhancing safety, accessibility, streetscape and supporting local businesses
Construction on Drouin’s $1.1 million Commercial Place precinct upgrade begins October 2025, improving safety, accessibility, streetscape, pedestrian crossings, laneways, lighting, greenery, and community usability, completing mid-2026. - Tim Bull urges faster rollout of cabins, blaming Melbourne bureaucracy for delays, not local parks staff
The first Cape Conran replacement cabin has finally been installed after six years, with calls to fast-track remaining bushfire recovery cabins. - Labor government delivers $2.73M Sale Hospital upgrade, modernising Community Services building for Gippsland healthcare staff
The Allan Labor government is delivering a $2.73 million upgrade to Sale Hospital's historic Community Services Building, modernising facilities for healthcare workers, patients, and students through the Regional Health Infrastructure Fund. - Gippsland Water begins Warragul wastewater plant upgrade to support growth, improve efficiency, and reduce environmental impact
Gippsland Water has begun a two-year Warragul wastewater plant upgrade, replacing ageing infrastructure, improving operations, reducing carbon emissions, and enhancing environmental outcomes to support rapid regional growth. - Woodside Recreation Reserve receives $387,750 LED lighting upgrade improving safety, access, and evening sports opportunities for local community
The Woodside Recreation Reserve will receive a $387,750 LED lighting upgrade, improving safety, sustainability, access, and evening sports opportunities, funded by the Victorian Government, Wellington Shire Council, and local partners. - Explore the 2026 Adventure range this May with new models, upgrades and free camping innovations on 8-9 May 2026
Explore the upgraded 2026 Adventure range on May 8-9, featuring J-Pod, Adventurer 48V and Crosstrak models, with expert guidance for free camping enthusiasts. - East Gippsland Shire backs $15M Bairnsdale Airport upgrade to boost emergency response and healthcare services regionally
East Gippsland Shire Council has backed a $15 million Bairnsdale Airport upgrade, extending the runway to boost emergency response, healthcare services, and regional aviation, supported by government funding and health agencies. - Bass Coast Shire Council implements speed limit updates to improve road safety and reduce wildlife collisions
Bass Coast Shire Council is updating speed limits across the region, including area-wide and rural roads, to improve driver safety, reduce wildlife collisions, and align with Victoria’s Safe System approach. - Morwell Gun Club unveils world-class olympic trap shooting upgrades, boosting training, competition and accessibility
Morwell Gun Club completed major upgrades under the Regional Sports Infrastructure Program, including new Olympic trap ranges, lighting, shelters and facilities, boosting training, accessibility, local jobs and Gippsland’s sporting opportunities. - Construction begins on Western Park Oval 2 Pavilion, including new curator shed and upgraded female-friendly facilities
Construction has started on Western Park Oval 2 Pavilion, beginning with a new curator shed, supporting local sports growth, female-friendly facilities, and community recreation, funded by Council and a government grant. - Baw Baw Shire Council welcomes $250,000 funding to upgrade Noojee Heritage Centre precinct and rail trail
Baw Baw Shire Council welcomes $250,000 funding for Noojee Heritage Centre precinct upgrades, supporting rail trail access, tourism infrastructure and local transition initiatives under the Forestry Transition Program. - Darren Chester welcomes Minister Catherine King’s confirmation that the Eastern Beach Road intersection remains a priority
The federal government has increased funding to $6.6 million for the Lakes Entrance road safety upgrade, but Federal MP Darren Chester says state government delays continue to stall the vital project. - Melina Bath urges Allan government to prioritise urgent upgrades for Gippsland schools in poor condition
Melina Bath urges Allan Government to urgently upgrade Gippsland schools, highlighting 2025 report revealing many in poor condition, with ageing infrastructure and maintenance deficits impacting students’ education. - Darren Chester welcomes safer Kalimna to Lakes Entrance walking path upgrade completed before Christmas period
Gippsland MP Darren Chester says thousands are enjoying the upgraded Kalimna-Lakes Entrance walking path, with new asphalt, safety barriers and intersection improvements completed before Christmas for locals and visitors. - Craig Watts Park playground in Neerim South closing temporarily for upgrades from 28 January to 31 March 2026
Craig Watts Park playground in Neerim South will be upgraded with new climbing, swing, and junior play zones, closing 28 January to 31 March 2026, as part of Council’s renewal program. - Wellington Shire Council invites residents to provide feedback on draft 2026 Residential Road Plan until 13 March 2026
Wellington Shire Council invites residents to provide feedback on the draft 2026 Residential Road Plan, focusing on Special Charge Schemes funding upgrades, with input closing Friday, 13 March 2026. - Darren Chester secured $818,000 in LER funding to deliver long-needed upgrades to Mallacoota Hall
Mallacoota Hall has been upgraded with improved accessibility, modern facilities and expanded community spaces, supported by $818,000 in LER funding, boosting its everyday use and strengthening resilience for future emergencies. - Demolition begins at Warragul Exhibition Hall, traffic changes implemented and materials salvaged for recycling and community reuse
Demolition of Warragul Exhibition Hall will begin this week, with traffic changes, asbestos removal, and material salvage for recycling, while the site will be remediated for future council consideration. - Latrobe City Council endorses community engagement on draft financial, asset, and road management plans
Council endorsed community engagement on key draft plans, including the Financial, Asset, and Road Management Plans, ensuring alignment with the Community Vision, Council Plan, and long-term strategic planning framework. - Bass Coast Shire Council installs 22 speed humps in Cape Paterson and San Remo from 11 May for road safety improvements
Bass Coast Council begins installing 22 speed humps in Cape Paterson and San Remo from 11 May, improving road safety following community consultation and traffic concerns. - Darren Chester accuses Victorian Labor of endangering Gippslanders by delaying Mallacoota-Genoa road upgrades
Federal Member Darren Chester warns Victorian Labor’s inaction on Mallacoota-Genoa Road, despite $10 million funding, endangers Gippslanders, leaving critical safety upgrades delayed and road conditions increasingly unsafe. - Baw Baw Shire Council secures $500k funding for Longwarry multi-sport pavilion upgrade project construction announcement
Baw Baw Shire secures $500,000 State funding for Longwarry Recreation Reserve multi-sport pavilion supporting football, netball, cricket and community facilities. - Darren Chester delivers $3000 grant to Rosedale Historical Society for eco-friendly heating upgrade and safety improvements
Darren Chester delivered a $3000 Volunteer Grant to Rosedale Historical Society, funding eco-friendly heating upgrades that improve safety and sustainability while supporting volunteers and preserving the district's heritage for future generations. - Bass Coast Council awards $1.01M contract to restore Wonthaggi heritage-listed old post office
Bass Coast Shire Council has awarded a $1.01 million contract to TS Constructions to restore Wonthaggi heritage-listed Old Post Office, preserving its historic character and ensuring long-term structural integrity. - Danny O’Brien urges Labor government to urgently fix South Gippsland Highway dangerous, deteriorating road conditions statewide
Danny O’Brien urges the Allan Labor government to urgently repair the deteriorating South Gippsland Highway, citing potholes, failing patches, and community frustration across key stretches before the busy holiday period. - Martin Cameron criticises continued delay of Bank Street Traralgon traffic lights safety upgrade
Morwell MP Martin Cameron criticises repeated delays to Bank Street Traralgon traffic lights, highlighting safety risks for nearly 20,000 daily users and urging urgent government action. - Mallacoota marks bushfire recovery milestone with streetscape, pavilion and hall upgrades completed
Mallacoota marks bushfire recovery milestone with Maurice Avenue, Mudbrick Pavilion, and Hall upgrades, supported by East Gippsland Shire Council and state and federal governments, strengthening community resilience and local infrastructure. - Martin Cameron criticises Allan Labor government for neglecting regional PSOs while funding Melbourne stations
Morwell MP Martin Cameron criticises Allan Labor Government for neglecting regional PSOs, citing rising Gippsland crime and calling for equal safety protections and additional officers under Coalition plans. - Latrobe City Mayor Sharon Gibson criticises delays, saying regional communities are neglected compared to metropolitan Melbourne
Latrobe City Mayor has criticised major delays to key road safety projects in Moe and Traralgon, saying regional communities are being left behind metropolitan Melbourne. - Tim Bull credited Darren Chester for securing post–Black Summer funding but criticised Labor’s mismanagement delaying the recovery project
Tim Bull has criticised delays to the Mallacoota–Genoa Road upgrade, saying the Victorian government has wasted funding on consultants while failing to deliver long-promised bushfire recovery works. - Discover Noojee historic Trestle Bridge, explore lush forests, rail trails, waterfalls, and heritage sites in charming old timber town
Explore Noojee historic trestle bridge, Victoria’s tallest, stroll rail trails, chase waterfalls, fish the Latrobe River, and enjoy cafés, pubs, lush forests, and the majestic Ada Tree nearby. - Swifts Creek Recreation Reserve officially opens during Omeo District Football Netball League Grand Finals celebrations on Saturday
Swifts Creek will celebrate the official opening of its $2.9 million upgraded recreation reserve during the Omeo District Football Netball League Grand Final on Saturday, 6 September 2025. - Craig Watts Park playground renewal completed in Neerim South community upgrade
Baw Baw Shire Council has completed the Craig Watts Park playground renewal in Neerim South, incorporating community and student feedback, with new equipment, safety upgrades, landscaping, and the slide arriving later. - Bass Coast Shire Council delivers new shared path linking Cowes and Ventnor, boosting transport safety and community connectivity
Bass Coast Shire Council will deliver a new 2km Ventnor Road Shared Path, linking Cowes and Ventnor, improving safety, accessibility, and community connectivity. The $1.96m project is jointly funded with the Australian government. - Check new 11-digit account reference numbers for accurate South Gippsland Water bill payments after July 2025 system upgrade
South Gippsland Water reminds customers to use their new 11-digit account reference number when paying bills after the July 2025 billing system upgrade. Payments using old numbers will no longer be processed.
|
|