Latest News
• Add My News • Search Old News

Managing peak demand as early rainfall boosts water availability in Macalister Irrigation DistrictAnticipated hotter, drier conditions prompt customers in the region to maximise available water for irrigation. As demand increases and watering patterns shorten, potential delays in our delivery system are expected. By news@gippsland - 2nd February 2024 - Back to News The Bureau of Meteorology declared Australia is in an El Nino weather pattern in September 2023, with the long-range forecast predicting increased chances of hotter, drier conditions in some parts of Australia. The early season rainfall in the Macalister Irrigation District means our customers have carried a high volume of water availability into early 2024. 
Total Channel Control system minimises manual intervention, reducing outfalls. Reduced capacity, noticeable during peak times. Planners assist customers facing order challenges Managing water demandAs predicted, weather conditions in the region have become hotter and drier and our customers will seek to make the most of their available water volumes to irrigate their properties. As soil moisture levels drop across multiple properties at similar times, we're likely to see an influx of water orders and spike in water demand. It's also likely our customers will shorten their watering patterns. This scenario places pressure on our delivery system that may lead to some delays because we must space out orders to deliver the required volumes of water within the constraints of the system. We spoke to our Macalister Customer Consultative Committee in December about this potential scenario, and how we've prepared to manage peaks in demand. Collaborating peak demandsWe want to work with our customers to help make things easier for everyone. To help get water to your property in a timelier way, we recommend: - Planning watering in advance and allowing three or more days to place orders
- Cancelling unwanted orders in a timely manner to free up the system for other irrigators
- Communicating early with water planners about follow on or order extensions
- Taking water through the night to lower peak loads during the day
- Ensuring the flow rate, duration and outlet matches the confirmed order
Speaking to water planners about filling on-farm storages and the best time and volumes to help support the entire system. Peak water deliveriesWe have a dedicated irrigation planning team who monitors our system during the irrigation season. Farmers can order water up to 14 days in advance of delivery over the phone or online using Waterline, our phone based and online ordering system. And we strongly encourage them to give us a minimum of three days' notice. Orders enter our Demand Management System that either accepts or declines their orders based on available capacity. Our DMS and Total Channel Control systems are active automations working on our modernised channel and pipeline network that allocate demand and manage flows. Channel control challengesThe Total Channel Control system minimises the need for manual intervention to operate channels and results in significantly reduced outfalls. However, this has reduced capacity in the system and is especially noticeable during peak times. If customers have trouble securing orders due to system capacity constraints, our planners will work with them to find availability within the channel as best they can. In addition, our System Performance Officers employed on a rotating 7-day roster of availability with 24-hour standby arrangements, will work with farmers to manage Southern Rural Water infrastructure on their properties and respond to any issues as they arise. Irrigation enhancementsIn December, we completed a treatment program that removed submerged weeds through our major carrier channels and several smaller supply channels. This treatment ensures our channels can deliver their maximum potential water volumes, and that Total Channel Control operates efficiently during peak demand periods. This irrigation season, we have adjusted the maximum order lead time from 31 days to 14 days. This will help minimise a situation where irrigators can potentially 'lock up' the system by ordering a long way in advance and cancelling at short notice. Our lead time adjustment will give customers a more equitable ability to access channel capacity. We will be communicating more with customers on the ordering and demand trends we are seeing and if there are areas in the system that we are seeing high demand that customers need to be aware of. Water orders detailsWe've improved our Macalister Irrigation District weekly snapshot report by removing some data at the top of the report that was giving a false impression of the system's capacity status during peak demand periods. These weekly reports help customers with strategic business planning. Finally, we will be working through a wide-ranging review of our channel system operations to identify further efficiencies and improvements. Irrigation water can be ordered over the phone or online using Waterline, Southern Rural Water's water order centre. To access Waterline, you must have a valid user number and password. If you don't have a user number and password, please contact Southern Rural Water on 1300 139 510. Pictures from National Water Grid website.
Source: http://gippsland.com/ Published by: news@gippsland.com

Related Articles- Nationals demand stronger policing as rising Latrobe Valley crime fuels growing community safety concerns and frustration
The Nationals say rising Latrobe Valley crime and fewer police officers demand urgent Labor government action, calling for stronger policing, tougher laws and better resources to restore community safety. - Gippsland Water storage levels remain strong despite below-average spring rainfall forecast, with no supply shortages expected across the region
Gippsland Water says strong storage levels will support customer demand through spring despite below-average rainfall forecasts, with no shortages expected. Customers are reminded to follow Victoria’s permanent water-saving rules. - Southern Rural Water manages Gippsland storages during rainfall, balancing flood risks, water supplies and community safety
Southern Rural Water managed Gippsland water storages during significant weekend rainfall, using controlled releases to create capacity, reduce flood risks and protect community safety and water supplies. - Macalister Irrigation District schedules submerged weed treatments for November and December to improve channel capacity and water delivery
Macalister Irrigation District will treat submerged weeds in irrigation channels during November and December 2026, improving water delivery. Customers must avoid treated water for 72 hours after treatment. - Gippsland Water customers invited to complete annual satisfaction survey for chance to win $100 bill credits and help improve services
Gippsland Water customers can complete the annual satisfaction survey from October 1 to 27, sharing feedback to improve services and entering a draw for $100 bill credits. - Gippsland Water urges customers to prepare alternative water supplies ahead of bushfire season and fire danger period
Gippsland Water urges customers to prepare alternative water supplies during the Fire Danger Period, recommending three litres of drinking water per person daily and monitoring service updates during emergencies. - Gippsland Water's people's panel brings 50 customers together to help shape future plans and pricing priorities for the region
Gippsland Water's People's Panel has brought together 50 randomly selected customers to help shape future plans and make recommendations influencing the corporation's 2028-33 Price Submission. - Gippsland Water renews 1950s Tyers raw water pump station to improve reliability and protect regional emergency water supply infrastructure
Gippsland Water has renewed its 1950s Tyers raw water pump station, improving drainage, protecting pipework and testing all four pumps to maintain reliable emergency supplies for Tyers and Traralgon treatment plants. - Gippsland Water increases basin cover cleaning to annual schedule to protect drinking water quality across service area
Gippsland Water is increasing drinking water basin cover cleaning from every 18–24 months to annually, helping prevent damage, reduce contamination risks and protect water quality. - Gippsland Water People’s Panel passes halfway mark, preparing recommendations to shape organisation’s 2028-33 price submission and priorities
Gippsland Water’s 50-member People’s Panel has completed three sessions exploring service priorities and customer needs, preparing recommendations to inform the organisation’s 2028-33 Price Submission. - Gippsland Water offers face-to-face bill support through September pop-ups across Morwell, Sale, Traralgon and Drouin
Gippsland Water will host September pop-ups across the region, offering customers face-to-face help with bills, payment plans, concessions and government assistance amid cost-of-living pressures, with events in Morwell, Sale, Traralgon and Drouin. - Gippsland Water upgrades Buckley's Hill basin to boost industrial reliability and strengthen emergency water supply resilience
Gippsland Water has upgraded Morwell Buckley's Hill raw water basin, improving water reliability for industry, supporting the energy sector, and providing an emergency backup water source for residential customers during supply disruptions. - Gippsland Water plants 150 Swamp Everlasting daisies at Dutson Downs to protect critically endangered species from climate change
Gippsland Water has planted 150 Swamp Everlasting daisies at Dutson Downs with GLaWAC, establishing habitat to protect the threatened species from climate change and population decline. - Gippsland Water backs biochar research to transform biosolids into sustainable soil health and waste management solutions
Gippsland Water is supporting national research into converting wastewater biosolids into biochar, aiming to improve soil health, advance sustainable waste management, and assess contaminant destruction, including PFAS, through innovative recycling. - Gippsland Water installs filter-to-waste system to better protect Maffra drinking water from contamination risks
Gippsland Water has installed a filter-to-waste system at Maffra treatment plant, improving drinking water protection, reducing supply disruptions, and strengthening resilience against pollution, storms, bushfires and other water quality events. - Reliable water access drives Busch Organics' sustainable farming success and secures its fourth-generation future in East Gippsland
Busch Organics relies on Mitchell River and groundwater to sustain organic vegetable production, while soil moisture technology, sustainable practices and family farming strengthen productivity and future generations. - Gippsland Water invests $3.4M renewing ageing water and sewer infrastructure across regional communities
Gippsland Water invested $3.4 million renewing ageing water and sewer assets, replacing 3.9 kilometres of water mains and relining 6.2 kilometres of sewer mains across Gippsland. - Gippsland Water reports progress on major projects, renewable energy and community engagement commitments
Gippsland Water’s 2026 Community Report highlights progress on major infrastructure projects, achieving 100 per cent renewable energy, emergency support initiatives and increased community engagement through its Sounding Board. - New Heart Morass watering infrastructure strengthens Gippsland Lakes wetland health and protects freshwater flows for future generations
New watering infrastructure at Heart Morass enables controlled freshwater flows, reducing salinity and supporting wetland health, wildlife habitat and long-term resilience across the Gippsland Lakes. - Four Gippsland students win Water Week Poster competition promoting conservation and sustainability
Four young Gippsland artists have been recognised in Gippsland Water’s 2026 National Water Week poster competition, highlighting water conservation. Mirboo North Primary School won $500, while student Penelope placed third statewide. - Traralgon Tyers interconnect begins, strengthening water supply reliability and resilience across four Gippsland towns for future regional growth
Gippsland Water has begun construction on a 4.5-kilometre pipeline linking four towns to Traralgon’s water network, improving reliability, resilience, efficiency and capacity for future regional growth. - Visa delays threaten regional harvest workforce as farmers and tourism employers demand urgent federal government action before summer
Farmers, tourism operators and regional employers warn visa delays could cause critical workforce shortages during summer harvest and tourism periods, urging the Federal government to restore timely visa processing. - East Gippsland communities transform emergency water tanks into vibrant murals celebrating resilience, recovery and local stories
East Gippsland communities have transformed emergency water tanks into vibrant murals celebrating resilience and recovery, with artworks completed at four locations and three more projects planned for Gipsy Point, South Buchan and Benambra. - Latrobe Housing Summit explores collaborative solutions to meet growing regional housing demand and support future economic development
Latrobe City Council’s Housing Summit brought together government, industry and community leaders to address rising housing demand, improve affordability and develop solutions supporting regional growth, investment and population increases. - New drinking fountains improve free water access across Sale's popular recreation facilities
Sale's major recreation facilities now offer improved free drinking water access, with new fountains at Aqua Energy, Port of Sale and Gippsland Regional Sports Complex, supporting hydration and reusable bottle use. - Labor announces four new regional early learning centres for 2029, expanding access to kindergarten and long daycare places
Labor will open four new Early Learning Victoria centres in Alexandra, Drouin, Hamilton and Seymour from 2029, providing more than 400 childcare and kindergarten places across regional Victoria. - Latrobe City pushes for fair community benefits, transparent water pricing and long-term investment as Yallourn Mine rehabilitation progresses
Latrobe City Council has urged fair community reinvestment, transparent water pricing and long-term funding certainty as EnergyAustralia seeks water entitlement for Yallourn Mine rehabilitation. - Working together to secure East Gippsland's water future through integrated water management
East Gippsland CMA and regional partners are collaborating through Integrated Water Management to address climate, flooding, population growth, stormwater, recycled water and wetland protection challenges while planning sustainable projects. - Warragul Library Centre moves closer with early works starting ahead of major construction and 2028 opening
Early works for Warragul $30 million Library and Learning Centre will begin next week, preparing the site for construction. The facility will feature library, cultural, meeting and co-working spaces, opening in 2028. - Labor government boosts Latrobe Valley businesses with funding to strengthen supply chains, expand markets and support future growth
The Carroll Labor government is funding six Latrobe Valley businesses to upgrade equipment, software and skills, strengthen supply chains and expand markets. - Baw Baw Shire Council Pop-Up Playgroups wins Victorian early years award for promoting children’s health, wellbeing and community connections
Baw Baw Shire Council’s Pop-Up Playgroups has won a 2026 Victorian Early Years Award, recognising its inclusive approach to supporting children’s wellbeing and connecting local families through play. - Gippsland commuters stranded after V/Line services end early, prompting calls for reliable regional rail services
Melina Bath criticised Gippsland rail disruptions after AFL fans were stranded following an early service cutoff, calling for reliable regional transport and promising 1,110 additional seats on Traralgon and Bairnsdale services. - The Nationals pledge $10M boost for Victoria's Neighbourhood Houses, supporting community hubs facing rising demand and cost pressures
The Nationals have pledged $10 million over four years for Victoria's Neighbourhood Houses, including $4 million for existing services and $6 million to establish and expand hubs in growing regions. - Draft Omeo District Place Plan released for after 10 months of consultation for final community feedback until 2 October 2026
East Gippsland Shire Council has released the draft Omeo District Place Plan for feedback, prioritising health, education, housing, employment, social connection, environmental care and emergency preparedness. Submissions close October 2. - Melina Bath condemned Labor over soaring vehicle thefts, with Victoria recording nearly twice New South Wales' victims
Melina Bath has condemned Labor over soaring vehicle thefts, citing Victoria's high theft rate and major increases across eastern Victoria, while calling for more police, stronger bail laws and tougher sentencing. - Moe’s first women’s cricket team makes history as $11M Ted Summerton Reserve upgrade boosts regional sport and accessibility
Moe’s Ted Summerton Reserve has received an $11 million upgrade, delivering improved sporting facilities, accessibility and female-friendly change rooms ahead of the town’s first women’s cricket match. The project supported 370 jobs. - Morwell Historical Society opens exhibition celebrating Northway Family’s pioneering legacy and Hazelwood’s early history for community visitors
Federal and state MPs opened Morwell Historical Society’s Pioneering Northway Family Exhibition, showcasing three generations of Hazelwood pioneers through photographs, documents and maps until November 29. - Danny O'Brien calls for urgent action on ongoing Gippsland power outages impacting residents, businesses and critical services
The Nationals' Danny O'Brien is calling on the Victorian government to demand answers from electricity providers over repeated Gippsland outages disrupting residents, businesses and critical medical equipment.
|
|