Gippsland › Latest news › Southern Rural Water
Macalister Irrigation District's 2025 season starts 15 August with upgrades, automation, and water order preparation
The Macalister Irrigation District season starts August 15 with healthy storages, automated outlets, regulator upgrades, and ongoing infrastructure improvements for reliable water delivery and customer service.
The season in the Macalister Irrigation District starts on Friday, 15 August and we're looking forward to another productive one here and in our irrigation districts.
Customers can order water from August 8, with deliveries from August 15. Recent upgrades include 15 automated outlets replacing manual meters
Healthy water storages
In the east, storage levels are healthy; with Lake Glenmaggie 79 percent full and the current 2025-26 seasonal allocation is 95 percent for High Reliability Water Shares - which gets reviewed each fortnight during the season. Our major storages in the west are over 60 percent full. We will continue to keep Melton Reservoir low and hold water in our storages higher up the catchment to reduce the effect of evaporation on water supply.
In the Macalister Irrigation District, we have started filling the irrigation channels to prepare for opening day. Stock and domestic water will be available to customers on the network as the channels and pipelines fill over the coming seven to 10 days.
Customers can place water orders from Friday, 8 August, with deliveries to follow from Friday, 15 August onwards. So, if you know what you need now you can use Waterline now to place your order.
Irrigation system upgrades
We've used the winter shut down period to deliver key upgrades and maintenance across our irrigation districts to ensure a smooth and reliable start to the irrigation season. We've automated 15 customer outlets, replacing manual Dethridge wheels with modern slip meters. These works mark the final upgrades under Phase 2 of the Macalister modernisation project, which has delivered $62.6 million in improvements since 2020, including 80 outlet upgrades completed last winter.
Slip meters allow customers to order water at any time, with outlets opening and closing automatically, making the system easier and more responsive for our customers. We've also upgraded eight regulators at four key sites along the Main Northern Channel and Valencia Creek Channel Offtake in the Macalister Irrigation District.
Infrastructure upgrade works
The regulator upgrades will help us manage water flow more accurately, reduce delays, and keep the system running smoothly. They are part of a larger, multi-year investment to strengthen critical infrastructure across the district. From 2025 to 2027, we'll continue this work during our scheduled winter works irrigation shutdown replacing more flume gates, pedestals, and regulator structures.
This winter, we started the Tunnel 5 replacement project that will be completed in two phases. We've replaced 140 metres of the downstream section with modern piping and will replace the remaining 80 metres of the upstream section during our 2026 winter shutdown period.
We also completed 40 kilometres of weed control, repaired pipes and headwalls, improved access tracks, fixed flow gates, tackled erosion, and upgraded walkways on key assets throughout the district.
Pictures from Southern Rural Water website.
Source: http://gippsland.com/
Published by: news@gippsland.com

Darren Chester meets Wellington Shire Council to address infrastructure priorities and concerns over reduced funding

Darren Chester urges East Gippsland Shire to fast-track Krauatungalung Walk missing links at Lakes Entrance foreshore

Darren Chester visited Sale College to congratulate Year 11 student Samantha Straw on winning the Premier's Spirit of Anzac Prize

Digging into soil science for health, productivity, and carbon insights with Dr Cassandra Schefe in Hallora Field Workshop

East Gippsland Jobs Expo returns at Cremin Hall, Bairnsdale to connect employers and job seekers on 20 August 2025

Have your say on coordinated subdivision plan for northern side of Bena Road, Korumburra long lots by 12 September 2025

Latrobe and Takasago strengthen sister city ties through cultural exchange, sport, education, and goodwill initiatives

Regional Worker Accommodation Fund Round 2 will support and boost affordable housing across regional Gippsland industries

Tim Bull urges action on 476% WorkCover Premium rise hitting Gippsland commercial fishing operators over four years
