Latest News
• Add My News • Search Old News

Water corporation joy over early bore results Initial results from Westernport Water test bores at Corinella show that the underground reservoir could supply up to 75% of the region’s normal daily use needs if dry conditions continue. By Susan Webster - 1st April 2008 - Back to News The results of the first bore drill show a daily flow rate of 1.3ML/day.
Two other bores are still to be assessed but hydrologists believe they will yield similar flows.
Westernport Water customers use an average of about 5 to 6ML/day at Stage Two restrictions.
The initial results, which were received at the water corporation last week were welcomed by acting CEO Keith Gregory.
"This confirms our belief in groundwater supplies as part of our augmentation project," he said. "Ever since the Candowie Reservoir levels sank to 6% of capacity last June we have been single-mindedly working towards this moment.
"The news means we can be confident about future water supplies due to the diversity of sources available to us."
Mr Gregory said that rain-fed supply into Candowie Reservoir would remain the corporation’s major water source.
Water pumped from the Bass River during times of high flow would be one of two further options.
"And now we have the security of another back-up, a third water source from these bore pumps," he said. "It means that Westernport Water is well-placed to ride out any big dry."
Mr Gregory praised the efforts of the Westernport Water engineers Helden Leereveld and Colin Bowker who scoured old maps and hydrology reports in the hunt for untapped aquifers at Corinella.
"The pair took on a task that required many, many long hours and a great deal of effort to produce outstanding results."
Source: http://gippsland.com/ Published by: susanw@ptarmigan.com.au

Related Articles- Gippsland Water storage levels remain strong despite below-average spring rainfall forecast, with no supply shortages expected across the region
Gippsland Water says strong storage levels will support customer demand through spring despite below-average rainfall forecasts, with no shortages expected. Customers are reminded to follow Victoria’s permanent water-saving rules. - Gippsland Water renews 1950s Tyers raw water pump station to improve reliability and protect regional emergency water supply infrastructure
Gippsland Water has renewed its 1950s Tyers raw water pump station, improving drainage, protecting pipework and testing all four pumps to maintain reliable emergency supplies for Tyers and Traralgon treatment plants. - Gippsland Water People’s Panel passes halfway mark, preparing recommendations to shape organisation’s 2028-33 price submission and priorities
Gippsland Water’s 50-member People’s Panel has completed three sessions exploring service priorities and customer needs, preparing recommendations to inform the organisation’s 2028-33 Price Submission. - Gippsland Water customers invited to complete annual satisfaction survey for chance to win $100 bill credits and help improve services
Gippsland Water customers can complete the annual satisfaction survey from October 1 to 27, sharing feedback to improve services and entering a draw for $100 bill credits. - Gippsland Water upgrades Buckley's Hill basin to boost industrial reliability and strengthen emergency water supply resilience
Gippsland Water has upgraded Morwell Buckley's Hill raw water basin, improving water reliability for industry, supporting the energy sector, and providing an emergency backup water source for residential customers during supply disruptions. - Gippsland Water plants 150 Swamp Everlasting daisies at Dutson Downs to protect critically endangered species from climate change
Gippsland Water has planted 150 Swamp Everlasting daisies at Dutson Downs with GLaWAC, establishing habitat to protect the threatened species from climate change and population decline. - Gippsland Water backs biochar research to transform biosolids into sustainable soil health and waste management solutions
Gippsland Water is supporting national research into converting wastewater biosolids into biochar, aiming to improve soil health, advance sustainable waste management, and assess contaminant destruction, including PFAS, through innovative recycling. - Gippsland Water offers face-to-face bill support through September pop-ups across Morwell, Sale, Traralgon and Drouin
Gippsland Water will host September pop-ups across the region, offering customers face-to-face help with bills, payment plans, concessions and government assistance amid cost-of-living pressures, with events in Morwell, Sale, Traralgon and Drouin. - Gippsland Water increases basin cover cleaning to annual schedule to protect drinking water quality across service area
Gippsland Water is increasing drinking water basin cover cleaning from every 18–24 months to annually, helping prevent damage, reduce contamination risks and protect water quality. - Gippsland Water urges customers to prepare alternative water supplies ahead of bushfire season and fire danger period
Gippsland Water urges customers to prepare alternative water supplies during the Fire Danger Period, recommending three litres of drinking water per person daily and monitoring service updates during emergencies. - Reliable water access drives Busch Organics' sustainable farming success and secures its fourth-generation future in East Gippsland
Busch Organics relies on Mitchell River and groundwater to sustain organic vegetable production, while soil moisture technology, sustainable practices and family farming strengthen productivity and future generations. - Gippsland Water installs filter-to-waste system to better protect Maffra drinking water from contamination risks
Gippsland Water has installed a filter-to-waste system at Maffra treatment plant, improving drinking water protection, reducing supply disruptions, and strengthening resilience against pollution, storms, bushfires and other water quality events. - Gippsland Water reports progress on major projects, renewable energy and community engagement commitments
Gippsland Water’s 2026 Community Report highlights progress on major infrastructure projects, achieving 100 per cent renewable energy, emergency support initiatives and increased community engagement through its Sounding Board. - Gippsland Water invests $3.4M renewing ageing water and sewer infrastructure across regional communities
Gippsland Water invested $3.4 million renewing ageing water and sewer assets, replacing 3.9 kilometres of water mains and relining 6.2 kilometres of sewer mains across Gippsland. - Southern Rural Water manages Gippsland storages during rainfall, balancing flood risks, water supplies and community safety
Southern Rural Water managed Gippsland water storages during significant weekend rainfall, using controlled releases to create capacity, reduce flood risks and protect community safety and water supplies. - Four Gippsland students win Water Week Poster competition promoting conservation and sustainability
Four young Gippsland artists have been recognised in Gippsland Water’s 2026 National Water Week poster competition, highlighting water conservation. Mirboo North Primary School won $500, while student Penelope placed third statewide. - Traralgon Tyers interconnect begins, strengthening water supply reliability and resilience across four Gippsland towns for future regional growth
Gippsland Water has begun construction on a 4.5-kilometre pipeline linking four towns to Traralgon’s water network, improving reliability, resilience, efficiency and capacity for future regional growth. - East Gippsland communities transform emergency water tanks into vibrant murals celebrating resilience, recovery and local stories
East Gippsland communities have transformed emergency water tanks into vibrant murals celebrating resilience and recovery, with artworks completed at four locations and three more projects planned for Gipsy Point, South Buchan and Benambra. - New drinking fountains improve free water access across Sale's popular recreation facilities
Sale's major recreation facilities now offer improved free drinking water access, with new fountains at Aqua Energy, Port of Sale and Gippsland Regional Sports Complex, supporting hydration and reusable bottle use. - Latrobe City pushes for fair community benefits, transparent water pricing and long-term investment as Yallourn Mine rehabilitation progresses
Latrobe City Council has urged fair community reinvestment, transparent water pricing and long-term funding certainty as EnergyAustralia seeks water entitlement for Yallourn Mine rehabilitation. - Working together to secure East Gippsland's water future through integrated water management
East Gippsland CMA and regional partners are collaborating through Integrated Water Management to address climate, flooding, population growth, stormwater, recycled water and wetland protection challenges while planning sustainable projects. - Labor announces four new regional early learning centres for 2029, expanding access to kindergarten and long daycare places
Labor will open four new Early Learning Victoria centres in Alexandra, Drouin, Hamilton and Seymour from 2029, providing more than 400 childcare and kindergarten places across regional Victoria. - Warragul Library Centre moves closer with early works starting ahead of major construction and 2028 opening
Early works for Warragul $30 million Library and Learning Centre will begin next week, preparing the site for construction. The facility will feature library, cultural, meeting and co-working spaces, opening in 2028. - Baw Baw Shire Council Pop-Up Playgroups wins Victorian early years award for promoting children’s health, wellbeing and community connections
Baw Baw Shire Council’s Pop-Up Playgroups has won a 2026 Victorian Early Years Award, recognising its inclusive approach to supporting children’s wellbeing and connecting local families through play. - Gippsland commuters stranded after V/Line services end early, prompting calls for reliable regional rail services
Melina Bath criticised Gippsland rail disruptions after AFL fans were stranded following an early service cutoff, calling for reliable regional transport and promising 1,110 additional seats on Traralgon and Bairnsdale services. - East Gippsland Council completes initial flood recovery assessments, providing support and referrals to affected residents and businesses
East Gippsland Shire Council has supported flood-affected residents and businesses through assessments, referrals and waste assistance following October’s severe rainfall, coordinating with emergency services, volunteers and agencies. - Macalister Irrigation District schedules submerged weed treatments for November and December to improve channel capacity and water delivery
Macalister Irrigation District will treat submerged weeds in irrigation channels during November and December 2026, improving water delivery. Customers must avoid treated water for 72 hours after treatment. - Moondarra Reservoir gains new pathway and native garden beds, enhancing recreation, accessibility and Aboriginal cultural connections
Gippsland Water has completed a new pathway and native garden beds at Moondarra Reservoir, improving visitor access, enhancing recreation and incorporating local flora, Aboriginal cultural information and community collaboration. - Flight Test Range Command Centre opens at Latrobe Airport, boosting Gippsland's drone and aerospace industries and economic diversification
A new Flight Test Range Command Centre at Latrobe Regional Airport will support drone and aerospace innovation, attract investment and create jobs across Gippsland's emerging Advanced Air Mobility sector. - Flight test command centre opens, strengthening Latrobe's role in Australia's advanced aviation innovation sector and creating new opportunities
Latrobe's new Flight Test Range Command Centre has opened at Latrobe Regional Airport, supporting advanced aviation research, drone technology, investment, manufacturing growth and skilled jobs across the region. - New Flight Test Command Centre opens at Latrobe Airport, boosting advanced aviation jobs, investment and innovation
A new Flight Test Range Command Centre at Latrobe Regional Airport has opened, supporting advanced aviation research, attracting investment, strengthening local businesses and creating new jobs across Gippsland. - Morwell Historical Society opens exhibition celebrating Northway Family’s pioneering legacy and Hazelwood’s early history for community visitors
Federal and state MPs opened Morwell Historical Society’s Pioneering Northway Family Exhibition, showcasing three generations of Hazelwood pioneers through photographs, documents and maps until November 29. - Morwell’s Icon Industrial receives $1.9M to upgrade infrastructure, attract investment, create jobs and diversify the local economy
Morwell’s Icon Industrial development has received a $1.9 million grant for road, sewer, water and drainage upgrades, supporting investment, job creation and economic diversification as the region transitions from traditional industries.
|
|