Gippsland › Latest news › East Gippsland Local News
Metung Boardwalk upgrade begins soon to improve safety, durability and access for community and visitors
Work to upgrade Metung Boardwalk begins in May, improving safety, durability and access as part of the council's asset renewal program. Stage 1 includes FRP decking, lighting, and substructure assessment.
Work to improve the Metung Boardwalk, which runs along the edge of Metung's Bancroft Bay, is about to begin, with the first stage of upgrades starting early next month. The project is part of council's broader asset renewal program and aims to make the boardwalk, one of the town's most used public spaces, safer and more durable.
Metung Boardwalk upgrades begin next month as part of council's asset renewal program, enhancing safety and durability for the community
Metung boardwalk upgrade
Mayor Cr John White said the boardwalk is one of Metung's most popular features and needs to be looked after properly. "It's well used by locals, fishers and tourists, and we want to make sure it stays in good shape for the long run. This first stage is all about improving safety, extending the life of the boardwalk, and keeping it accessible for everyone," John said.
Stage 1 of the project will run from May to July, to avoid peak tourist times and reduce disruption. Access to the boardwalk will be closed while works are underway. Some carparks at the marina will be used for plant and equipment during the works.
Around 50 metres of the boardwalk, including the ramp north of Metung Marina, will be renewed. This work will address termite activity and timber deterioration by replacing the timber decking with a fibre-reinforced polymer (FRP) surface, which provides grip in wet or sea-affected conditions and will stand up better to fire, rot and insects.
Sustainable boardwalk renewal
While we recognise many locals love the traditional timber boardwalk, FRP is frequently used in other marine environments and existing jetties in East Gippsland, and has also been adopted due to challenges sourcing suitable timber. This stage will also give council an indication of the condition of the substructure, which will help shape future stages of the project.
Stainless-steel handrails and solar LED bollard lighting will also be installed. Where needed, piles will be reinforced with steel that matches existing structures. Stage 1 will run from late May to July. Later stages will proceed dependent on funding and the findings from this first phase.
Investing in infrastructure
Cr White said the boardwalk upgrade is a practical step in maintaining the infrastructure the community relies on. "This work is about making sure the boardwalk is around for future generations to enjoy. We'll keep locals updated through YourSay, berth holders are being contacted directly, and our project supervisor is there to help with any enquiries," he said.
Council manages more than $1 billion in assets across East Gippsland and is committed to maintaining and improving infrastructure to meet the needs and aspirations of local residents, creating conditions for people and places to thrive. For more information or to provide feedback, contact the project supervisor on 5153 9500 or email feedback@egipps.vic.gov.au.
Pictures from Metung, Gippsland Lakes Facebook page.
Source: http://gippsland.com/
Published by: news@gippsland.com

Darren Chester and Cycling Without Age Gippsland bringing joy to Buchan locals with first trishaw rides through Caves Reserve

Darren Chester welsomes Buchan Recreation Reserve redevelopment with multi-million dollar funding to boost community facilities

David Littleproud urges Labor to reinstate interest-free Regional Investment Corporation loans for flood and drought-affected farmers

Have your say and help shape Baw Baw Domestic Animal Management Plan 2026 - 2029 round 2 by 29 June 2025

Latrobe City Council secures battery backup to boost community energy resilience at Moe/Newborough and Churchill

Magpie geese spotted! Rare sightings in Maffra and Bairnsdale underscore importance of Gippsland wetlands

Join the East Gippsland 'Rising Strong 2025' community resilience forum with keynote Speaker Lucy Kaiser on 6 June 2025

Statewide drought support and ESVF pause a win for farmers, but fight for fairness continues

Bath criticises Labor blocking immediate 'Machete Ban', prioritises politics over community safety amid rising knife crime
